Repository logo
 
Publication

Relatório de estágio para obtenção de Grau de Mestre: empresa dst group – Building Culture

datacite.subject.fosEngenharia e Tecnologia::Engenharia Eletrotécnica, Eletrónica e Informáticapt_PT
dc.contributor.advisorSoares, Orlando
dc.contributor.authorLopes, Mauro Rafael Sobrinho
dc.date.accessioned2020-12-21T10:25:43Z
dc.date.available2020-12-21T10:25:43Z
dc.date.issued2020
dc.date.submitted2019
dc.description.abstractO estágio curricular do curso de Mestrado em Engenharia Industrial, do Instituto Politécnico de Bragança foi concretizado na empresa dst group – Building Culture, com a duração de 1134 horas, no departamento de compras da dte Instalações Especiais, com a função atribuída de responsável de compras dos materiais elétricos, hidráulicos, AVAC, entre outros, necessários para a conceção de um edifício. Ao longo dos últimos anos, o setor da Construção Civil tem sofrido uma profunda crise, provocada pela recessão da economia mundial, que conduziu à queda dos principais indicadores do sector como por exemplo: O número de empresa; O número de trabalhadores e a redução do volume de negócios. As empresas adaptaram-se e criaram os departamentos de compras, para adquirir os materiais necessários a um preço mais acessível, e assim aumentar a margem de lucro. As atividades desenvolvidas no decorrer do estágio podem ser agrupadas em cinco grandes áreas: Elaboração de mapas comparativos, Adjudicação de pedidos de compra; Formalização de contratos de subempreitada; Registo da evolução dos processos na base de dados da empresa; Atividade de Procurement. Além disto, propus-me a realizar outras atividades fundamentais como: a criação de um mapa comparativo de avaliação de subempreiteiros e sourcing.pt_PT
dc.description.abstractThe curricular internship of the Master's course in Industrial Engineering, from the Instituto Politécnico de Bragança was carried out in the company dst group – Building Culture, lasting 1134 hours, in the purchasing department of dte Instalações Especiais. With the role of responsible for purchasing electrical, hydraulic and AVAC materials, among others, necessary for the design of a building. Over the past few years, the civil construction sector has suffered a profound crisis. Caused by the recession of the world economy, which led to the fall of the main indicators of the sector such as: The number of companies; The number of workers and the reduction in turnover. Companies have adapted and created purchasing departments, to acquire the necessary materials at a more affordable price, and thus increase the profit margin. The activities developed during the internship can be grouped into five major areas: Elaboration of comparative maps, Adjudication of purchase orders; Formalization of subcontracting contracts; Record of the evolution of processes in the company's database; Procurement activity. In addition to this, I set out to carry out other fundamental activities such as: the creation of a comparative map of subcontractors assessment and sourcing.pt_PT
dc.identifier.tid202559890pt_PT
dc.identifier.urihttp://hdl.handle.net/10198/22981
dc.language.isoporpt_PT
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0/pt_PT
dc.subjectMapas comparativospt_PT
dc.subjectAdjudicaçõespt_PT
dc.subjectContratos de subempreitadapt_PT
dc.subjectRegisto de processospt_PT
dc.subjectSourcingpt_PT
dc.titleRelatório de estágio para obtenção de Grau de Mestre: empresa dst group – Building Culturept_PT
dc.typemaster thesis
dspace.entity.typePublication
rcaap.rightsopenAccesspt_PT
rcaap.typemasterThesispt_PT
thesis.degree.nameEngenharia Industrialpt_PT

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Lopes_Mauro.pdf
Size:
3.44 MB
Format:
Adobe Portable Document Format